As part of an extension to the existing National Grid sub-station near Exeter, Preston Engineering Survey Ltd were asked to carry out positional checks of newly constructed foundations and holding-down bolts prior to the installation of the new transformer and electrical equipment.
The checks were presented showing the as-constructed works overlaid onto the original design drawing with positional deviations recorded.